Explore KOR-IT custom drilling equipment used for bridge railing upgrades and demanding infrastructure projects, including the Lake Pontchartrain Causeway.

Featured Project • Louisiana

Lake Pontchartrain Causeway Bridge Railing Upgrade

In 2018, JB James Construction was awarded a major contract to upgrade the older southbound span of the Lake Pontchartrain Causeway. The project added steel guardrails above the original concrete barrier to improve protection for motorists.

KOR-IT built custom sliding drill systems for work on the bridge—an example of purpose-built equipment supporting a large-scale infrastructure project.

2018Contract awarded to JB James Construction
$33.6MReported original construction contract value
25″ → 46″Reported total barrier height after upgrade
Custom-Built KOR-IT Equipment

Built for a Unique Bridge Drilling Challenge

Bridge projects can demand drilling solutions that go beyond standard stand-mounted machines. For the Causeway work, KOR-IT produced custom sliding drill assemblies designed for the contractor's specific application.

  • Custom equipment built for the project
  • Sliding drill configuration for repeatable positioning
  • Purpose-built approach to a challenging work environment
  • Collaboration around specialized drilling requirements
Custom KOR-IT sliding drill assemblies after fabrication in the shop
Custom sliding drills photographed in the shop after fabrication.
From Shop to Jobsite

The Custom Drill Systems in Action

These project photos show the equipment on the Causeway, where crews worked on the bridge railing upgrade.

Why the Upgrade Mattered

Strengthening a Major Transportation Link

The original southbound span, opened in 1956, had concrete barriers approximately 25 inches high. The guardrail project added approximately 21 inches of steel barrier, bringing the reported total height to 46 inches.

The work was intended to help reduce the risk of taller vehicles, including SUVs and trucks, going over the bridge railing. The overall safety improvements are attributed to the bridge upgrade—not solely to any drilling equipment.

KOR-IT's contribution: Custom sliding drilling equipment developed for the contractor's project needs.

Nighttime bridge construction and work lights on the Lake Pontchartrain Causeway
Infrastructure Applications

Specialized Drilling for Demanding Projects

Whether you're upgrading existing structures or planning new construction, KOR-IT can discuss drilling equipment suited to your application.

Bridge Railing Upgrades

Equipment solutions for repetitive concrete drilling and specialized mounting requirements.

Structural Modifications

Discuss drilling requirements for retrofits, rehabilitation, and infrastructure improvements.

Custom Equipment Builds

Explore purpose-built drilling configurations when standard equipment isn't the right fit.

Talk to a KOR-IT Expert

Have a Bridge Project That Needs a Custom Drilling Solution?

Tell us about the structure, drilling pattern, hole size, mounting constraints, and project schedule. Our team can discuss whether a standard or custom equipment configuration is appropriate.

Call 1-888-727-4560

Tell Us About Your Project

This form submits through Shopify. Equipment suitability and pricing are confirmed by KOR-IT.